To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variable

KB04020 Estimated development in building activity over the past year, twice a year (2006M06-2024M01)

Choose variables

Birita Mortansdóttir
2/8/2024
number and pct.
H
8/5/2024
6/25/2015
KB04020_KB_BYGSEIN
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Mandatory

Selected 0 of total 2

Mandatory

Selected 0 of total 4

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2006M06 , 2007M01 , 2007M06 ,

Selected 1 of total 36

Number of selected data cells are:
(maximum number allowed is 8,000,000)

Presentation on screen is limited to 10,000 rows and 300 columns

Number of selected cells exceeds the maximum allowed 8,000,000
Symbols: -  Nil (exactly zero)
0  Rounded to zero
 •  Not applicable
 ••  Not available or too uncertain
 ••• Not disclosed, confidentiality/privacy protected

The balance-figure is the difference between the positive and negative answers and is ranging from -100 to +100. The indicator and balances for the building activity show development, current situation and expectations based on 6 questions asked twice a year in a survey of 20-25 companies. The questions refer to i.a. trends in production, possible limiting factors, expected employment, expected changes in prices, order books, and secured work counted in number of months.

measure

Averaged

To estimate the level of the figure, the arithmetic average of all measurements so far is provided. In time this average will converge to the neutral value for each question.